Freight Budget & Variance Simulator S2

Six-factor PVM bridge · budget build · Monte Carlo risk band · shared assumption registry

Linehaul is modelled as volume × miles per pound × rate per mile and decomposed by sequential substitution into Volume / Mix / Network / Rate, with Fuel and Accessorial separated out. The six factors sum exactly to the actual change — the residual is zero by construction. Sequential substitution is order dependent, so the Shapley symmetric average is shown alongside to expose the bias.
PVM bridge waterfall
Monthly freight cost — actual and budget
Unit cost trend ($/cwt)
Monte Carlo budget distribution
Variance contribution — what makes the budget uncertain